Score and module breakdown
Overall 0-100 score plus Home Flow, Privacy & Sightline, Airflow, and KitchenCheck scores.
Sample report
The paid deliverable is not a screenshot. It is a structured report with scores, issue maps, evidence, suggestions, designer questions, and a clear review boundary.
Top issue: fridge-to-sink path crosses dining traffic and lacks a landing zone.
Report contents
Overall 0-100 score plus Home Flow, Privacy & Sightline, Airflow, and KitchenCheck scores.
Floor plan markers, paths, sightline cones, airflow routes, and kitchen workflow paths.
Each issue includes what was observed, why it matters, and how confident the review is.
Low-risk planning suggestions first, with higher-risk construction items clearly labeled.
Short prompts users can send to a designer, remodeler, or cabinet consultant.
Clear disclaimer and reminders for structure, code, MEP, gas, ventilation, and fire safety.
In the app
Users see the score, top issues, and map evidence first, then unlock the full PDF when they need the complete designer-ready package.
Fridge to sink path crosses dining traffic.
Entry sightline reaches bedroom door.
Module snapshot
| Module | What it checks | Evidence |
|---|---|---|
| Home Flow Check | Find narrow passages, furniture conflicts, door swings, and everyday routes that feel awkward after move-in. | Entry to living room route, Narrowest passage width, Furniture and door conflicts |
| Privacy & Sightline Check | Check whether the entry, dining area, or living room has direct visual exposure into bedrooms, beds, bathrooms, or work zones. | Entry sightline cone, Private-zone exposure, Low-cost privacy fixes |
| Airflow Check | Estimate natural ventilation potential from openings, room connections, door states, and likely dead-air zones. | Cross-opening potential, Room connection graph, Dead-air zones |
| KitchenCheck | Review fridge, sink, prep, stove, landing space, door swings, and serving paths before cabinets or appliances are ordered. | Fridge to sink distance, Landing-zone availability, Prep to stove path |
Sample reports are planning aids. They do not certify code compliance, structural safety, HVAC performance, permit approval, or construction feasibility.